×

Error

[showplus] Critical error: Insufficient memory to carry out the requested operation on root/images/Showplus940w/RunwayOpening100315/DaedalusOfficialRunwayOpening10Mar15LFAA2G2at940.jpg, 1553820 bytes required, -10485760 bytes available.

Runway resurfacing March 2015

Photos and video of the resurfacing of the runway.

[showplus] Critical error: Insufficient memory to carry out the requested operation on root/images/Showplus940w/RunwayOpening100315/DaedalusOfficialRunwayOpening10Mar15LFAA2G2at940.jpg, 1553820 bytes required, -10485760 bytes available.

Runway 23/15 at Lee was re-opened with a small ceremony on 10 March 2015 after resurfacing. The work was a major investment by Fareham Borough Council, demonstrating their determination that the airfield will succeed and prosper. During the resurfacing work the old runway lighting was removed. The old lights were mounted on concrete blocks to either side of the runway. Not only were these a hazard to any aircraft departing the runway but they were also non-compliant with standards for spacing. Provision was made for the installation of compliant lighting in the future as part of the works.

Drone footage of the resurfacing work